New-Build Neurorehabilitation at Beatrixoord, Haren
Commissioned by UMCG Beatrixoord Groningen and carried out in collaboration with the main contractor Friso Bouwgroep B.V., BHP Funderingstechniek provided the foundation for the new Neurorehabilitation Centre at Beatrixoord in Haren. This required a solid and durable substructure.
Number of piles installed: 99 mortar-screw piles
Diameter: Between Ø 400 mm and Ø 500 mm
Length: Up to 18.5 m
Installation machine: Junttan PM 16, selected for its precision, reliability, and efficiency in deep foundation works
Client: UMCG Beatrixoord Groningen
Main contractor: Friso Bouwgroep B.V.
Mortar-screw piles were chosen for their high load-bearing capacity, performance in varied soil conditions, and low vibration—making them ideal for environments where noise and disturbance must be minimized