Gorredijk Substation
BHP Funderingstechniek delivered the foundation work for a new 10 kV electrical substation located in Gorredijk. The project was commissioned by Liander and executed in collaboration with the construction joint venture of K_Dekker and Tervoort.
Project Details:
- Foundation type: Screw‑in injection piles
- Number of piles installed: 65
- Pile diameters: Ø 273 mm and Ø 350 mm
- Pile length: Approximately 5 m per pile
- Installation equipment: Precision-driven installation machinery designed to minimize disturbance
- Client: Liander
- Main contractor: K_Dekker & Tervoort JV
The screw‑in injection piles offer a durable, efficient foundation suited for utility-grade infrastructure, while minimizing impact on the surrounding area.