20 kV Switching Station in Sint‑Maartensbrug
As part of electrical infrastructure improvements near Sint‑Maartensbrug, BHP Funderingstechniek delivered the foundation solution for a new 20 kV switching station, commissioned by Liander and executed in collaboration with K_Dekker / Tervoort Construction JV.
Project Details
-
Foundation type: Screw‑in injection piles
-
Number of piles installed: 51
-
Pile diameters: Ø 273 mm or Ø 350 mm
-
Pile length: Approximately 5 m each
-
Client: Liander
-
Main contractor: K_Dekker / Tervoort Construction JV
Screw‑in injection piles were chosen for their strength and installation efficiency. They offer dependable support for the station while minimizing disturbance to surrounding soil and infrastructure.