Back to overview
Campus Winschoten
BHP Funderingstechniek proudly contributed to the construction of Campus Winschoten, a collaboration between main contractor Van Wijnen Groningen and the client Stichting Scholengroep Trivium – Stadskanaal. In 2023, a total of 94 high-quality mortar screw piles were installed as part of this modern educational development.
Project Details:
-
Client: Stichting Scholengroep Trivium – Stadskanaal
-
Main contractor: Van Wijnen Groningen
-
Location: Winschoten
-
Number of piles: 94 mortar screw piles
-
Pile diameter: Ø 450 mm
-
Pile length: Approximately 14 m
-
Installation machine: Junttan PM 16
This project reflects BHP’s ability to deliver solid and reliable foundations tailored to the specific needs of educational buildings. The result is a future-proof campus that supports learning, development, and sustainability.